Bathrooms, showers, ensuites and cloakrooms
BEFORE
BEFORE
BEFORE
AFTER - Radiator moved & changed for towel rail, tiled floor
AFTER - Counter-top basin, P-shaped bath with shower screen
BEFORE - Shower to be replaced. Basin to be moved. Floor to be re-tiled. Walls to be re-tiled
AFTER - new shower, wall tiles with feature border and relocated towel rail.
BEFORE - basin and toilet to be moved. Boxed-in pipework between to be removed with new pipework hidden in wall.
AFTER - relocated toilet. Towel rail now in place of basin. Boxing removed and pipework hidden. Re-tiled floor.
BEFORE - Floor and wall-mounted cabinets to be removed. Towel rail to be relocated.
BEFORE - Relocated toilet and basin. New floor cabinets.
New wall cabinet with integral cornice lighting and shaver socket
BEFORE
BEFORE
DURING - Appliances removed. Walls repaired and re-boarded before re-tiling
DURING - Walls ready for re-tiling
DURING - Tiling begun....
DURING - Re-tiled walls ready for grouting
AFTER - New bath, counter-top basin and cabinet, mirrored wall cabinet, electric shower and close-coupled toilet
BEFORE - Internal bathroom with cast-iron bath, over-bath electric shower, shower curtain, basin and toilet with mid level cistern
BEFORE - Cast iron bath stained with limescale build-up. Basin over-hanging bath.
BEFORE - Toilet and basin with exposed pipework.
AFTER - New bath, bath screen, electric shower, basin, toilet, wall and floor tiles
AFTER - Basin relocated away from bath
AFTER - Toilet and basin pipework chased into wall and tiled over.