Heating and hot water

Boiler installation, servicing and landlord certificates

All gas work undertaken by GasSafe (formerly CORGI) registered gas engineer

POWER FLUSHING

Powerflushing central heating system to remove sludge and debris. Improves boiler life, efficiency and heat output from radiators
First flush - years of sludge and magnetic debris
From right to left - first flush with fresh water (sediments settled out); second flush with cleaning chemical; final flush with fresh water (no sediment)
Water free from debris and sludge after final flush

CENTRAL HEATING & HOT WATER COMPONENTS

CENTRAL HEATING SLUDGE AND DEBRIS REMOVAL

Central heating pipe with sludge build-up before magnetic debris filter fitted
Magnetic debris filter fitted to central heating circuit. Removes debris as water flows around circuit
Inside filter, sludge and debris collects around magnetic core
Core separated and cleaned
Clean core ready to go back into filter